
Control and supervision of rehabilitation works of Segou-Bla-Koutiala-Faramana-Burkina border (276 km) and Ouan-Sevare roads (106.5 km)
Paese
MaliCliente
Ministère des Travaux Publics et des Transports – Direction Nationale des Travaux PublicsFinanziatore
EDFPeriodo
06/1996 - 01/1999Descrizione Progetto
Final Design for the rehabilitation, the covering remake of existing roads. Topographical survey, geological-technical study, preparation of the tender documents.
Segou-Mali border section: base and foundation layer in natural laterite. Covering in 2 or 3 layers surface treatment, by using laterite and dolerite stones. Rehabilitation of the bridge over the Bani river (L=450 m): bearing substitution, joint remake, impermeabilization.
Section Ouan-Sevare: Modification of the road level on 18,00 km and introduction of new drainage structures. Strengthening of existing covering support by 1 layer surface and double laterite stone treatment.
Descrizione Servizi
Final design and preparation of tender documents. Works control and supervision.
