
Final design of the Cella-Dindiogo road (45 Km) in the Central-Eastern part of the country
Paese
Burkina FasoCliente
Government of Burkina FasoFinanziatore
FAO - Italian Ministry of Foreign AffairsPeriodo
01/1985 - 01/1986Descrizione Progetto
Intervention included in the works planned for the rural development of the Region Stabilized soil road including a bridge over the Volta river. Topographic survey, geological-technical study, preparation of Technical and Tender documents.
Descrizione Servizi
Final design.
