
Four earth dams for the construction of Dori-Tera-Niamey road
Paese
Burkina FasoCliente
Autorité de Liptako-GourmaFinanziatore
ADBAssociazione
EUROPROGETTI – Italy (member)Periodo
01/1984 - 01/1986Descrizione Progetto
Preliminary and final Design with drawing up of Tender Dossier for the construction of 4 earth dams necessary to supply water during the works for the construction of the Dori-Tera-Niamey road. The design of such dams also took into consideration the future permanent use by local population.
Descrizione Servizi
Preliminary and final design and Preparation of Tender documents.
