Mission to update studies, monitor control and coordinate road construction and asphalting works in the area of the Bagré Growth Pole

Mission to update studies, monitor control and coordinate road construction and asphalting works in the area of the Bagré Growth Pole

Country

Burkina Faso

Name of Client

Société de Développement Intégré du Pole de Bagré

Financing sources

IDA

Association

ACE lngénieurs Conseils (partner)

Duration

01/2022 - 10/2023

Project Description

 

  • With regard to Regional Road n°09 (RR09), the project begins at the end of the surfacing of the section (approximately 25 km from the intersection with the RN16), not far from the village of Bagré and the end of the project is located in the town of Dindéogo at the junction with the RN29, i.e. a length of 35.84 km;

 

  • For the spur n°01 (Bagré village – Bagré town), the project starts south of the village on the RR09 and ends south of the town of Bagré, on the primary channel, i.e. a length of 9.21 km;

 

  • The spur n°02 (BAGREPOLE – Bagré ville) originates in BAGREPOLE on the RR09 at PK 01+750 and ends east of the city of Bagré on the ramp n°01 at PK 05+550, i.e. a linear of 2.92 km.

 

The total length of the road sections to be developed under this project is 47.97 kilometers.

 

Paved road geometry:

  • Total length : 48 km
  • Cross section: The project provides for three (03) types of geometric cross sections of the enlargements of the platform at 10.20 m in open country, 9.20 m in the crossing of the irrigated perimeter and 12.20 m in crossings of large agglomerations. In line with the two (02) reinforced concrete bridges of 140 m and 60 m respectively at PK 12+875 and PK 13+360 to be retained, the rolling width is 7.00 m.

 

Drainage structures :

  • Gutters 24,000 m all dimensions combined
  • Culverts 67 culverts to replace or extend

Services Description

L-0: Design update report (APS-APD-DAO)

L-1: Monthly works progress reports

L-2: Quarterly Report

L-3: Final Report