Final Technical studies concerning the periodical maintenance works for Dioila-Massigui (100 km) and Dioila-Sikasso (115 km) roads
Country
MaliName of Client
Ministère des Travaux Publics et des TransportsFinancing sources
ADF (African Development Fund)Duration
12/1998 - 05/2000Project Description
Location of road sections to be rehabilitated; topographic study; geotechnical study and pit location; structure rehabilitation; environmental impact study; traffic and internal profitability study; drawing out of tender documents.
Services Description
Final design for the periodic maintenance of road tracks.