Supervision and control of construction works of rural roads in Agadez and Tahoua regions (256 km), Lot 2: Tassara-Egawane-Tchintabaraden - CRIS n° 409 293
Country
NigerName of Client
Delegation of the European UnionDuration
12/2018 - 12/2021Project Description
The objective of the project is to control and supervise the construction and rehabilitation works of the Tassara-Egawane - Tchintabaraden earth road (126 km).
The current track connecting Egawane to Tchintabaraden develops on flat sandy grounds, with rare intercalations of limestone detritus which clearly outcrop near the village of Garoua. After Garoua, the track presents basic improvements (occasional interventions, especially with German cooperation, through NIGETIP). The current track between Egawane and Tassara is made up of a track without any particular development, on mainly sandy soil. The route, extremely flat, develops on essentially sandy soil, with rare shrub vegetation.
Road project geometry:
- Total road length: 126 km
- Carriageway width: 6 m
- Shoulders width: 8 m
Road quantities:
- Earthworks (fill/cut): 450 000 m3
- Wearing course : 210 000m3
Structures:
- Culverts (box/pipe): 1
- Irish crossing (length 20/30/40/50 m): 85
Services Description
Control and supervision of works. Monthly reports ; Intermediate activities reports ; Final activity report ; Works provisional reception ; Provisional final report ; Works final reception ; Closing final report ; Special reports