Engineering studies for the periodical maintenance of the 1st lot sections, 5th group, Panamericana Norte road
Paese
PeruCliente
Ministerio de Transportes, Comunicaciones, Vivienda y ConstrucciónFinanziatore
BID-Banco Inter-Americano de Desarrollo e "Tesoro Pubblico"Associazione
CORPORACION DE RACIONALIZACION Y CONSULTORIA S.A. – Peru (partner)Periodo
09/1993 - 12/1993Descrizione Progetto
Engineering studies for the periodical maintenance of the 1st lot sections, 5th group, Panamericana Norte road, Sections:
Section I: Santa - Ovalo Industrial bridge (Trujillo) (km 445,087 – km 558,590) (111.50 km)
Section II: Industrial Square (Trujillo) - Pacasmayo (km 568,700 – km 667,000) (110.28 km)
Section III : km 558,520 - Junction R1N (El Milagro) (24, 60 km). Beltway of the Trujillo town.
Final Design for the improvement of the road platform and rehabilitation of superstructure of approximately 220 km of the Panamericana road. Design of the beltway of the Truijllo town.
Track study, topography, geotechnical survey, drainage and engineering structures, traffic study, traffic signs and road security, environmental impact, road maintenance program, design economical estimation, elaboration of three technical means at the Tender level.
Descrizione Servizi
Final design and preparation of Tender documents.