Engineering studies for the periodical maintenance of the 1st lot sections, 5th group, Panamericana Norte road
Country
PeruName of Client
Ministerio de Transportes, Comunicaciones, Vivienda y ConstrucciónFinancing sources
BID-Banco Inter-Americano de Desarrollo e "Tesoro Pubblico"Association
CORPORACION DE RACIONALIZACION Y CONSULTORIA S.A. – Peru (partner)Duration
09/1993 - 12/1993Project Description
Engineering studies for the periodical maintenance of the 1st lot sections, 5th group, Panamericana Norte road, Sections:
Section I: Santa - Ovalo Industrial bridge (Trujillo) (km 445,087 – km 558,590) (111.50 km)
Section II: Industrial Square (Trujillo) - Pacasmayo (km 568,700 – km 667,000) (110.28 km)
Section III : km 558,520 - Junction R1N (El Milagro) (24, 60 km). Beltway of the Trujillo town.
Final Design for the improvement of the road platform and rehabilitation of superstructure of approximately 220 km of the Panamericana road. Design of the beltway of the Truijllo town.
Track study, topography, geotechnical survey, drainage and engineering structures, traffic study, traffic signs and road security, environmental impact, road maintenance program, design economical estimation, elaboration of three technical means at the Tender level.
Services Description
Final design and preparation of Tender documents.