Farim bridge

Economic Study and Technical Engineering Design for the construction of the Farim Bridge (320 m)

Paese

Guinea Bissau

Cliente

AGEOPPE

Finanziatore

Union Economique et Monétaire Ouest Africaine (UEMOA)

Periodo

03/2012 - 07/2014

Descrizione Progetto

The design consists in the choice of the layout, the realization of surveys, a technical option choice between prestressed concrete or steel-concrete composite deck, the definition of static concept of the structure. The preliminary design will include a new
economic and environmental impact study. The final design will include all
tender documents.

Descrizione Servizi

Detailed Engineering Design of the structure, Topographic study, Geotechnical study, Geo-electrical study, Hydraulic and Hydrologic study, Preliminary dossier, Technical-economic feasibility study, Traffic study, Environmental Impact study; Final Design, Tender Dossier.