Economic Study and Technical Engineering Design for the construction of the Farim Bridge (320 m)
Country
Guinea BissauName of Client
AGEOPPEFinancing sources
Union Economique et Monétaire Ouest Africaine (UEMOA)Duration
03/2012 - 07/2014Project Description
The design consists in the choice of the layout, the realization of surveys, a technical option choice between prestressed concrete or steel-concrete composite deck, the definition of static concept of the structure. The preliminary design will include a new
economic and environmental impact study. The final design will include all
tender documents.
Services Description
Detailed Engineering Design of the structure, Topographic study, Geotechnical study, Geo-electrical study, Hydraulic and Hydrologic study, Preliminary dossier, Technical-economic feasibility study, Traffic study, Environmental Impact study; Final Design, Tender Dossier.