Supervision of the periodic maintenance works for asphalted roads- 9th FED Road programme (283 km), including urban roads in Dogondoutchi (2200 m) and Birni N’Konni (2050 m)
Paese
NigerCliente
Ministère de l’Economie et des FinancesFinanziatore
EDFPeriodo
02/2007 - 08/2010Descrizione Progetto
Works concern 2 lots in the central zone of Niger (283,050 km), in particular :
- Lot 5 RN1 E: Dogondoutchi –Birni N’Konni 144,164 km (urban roads in Dogondoutchi (2200 m) and Birni N’Konni (2050 m))
+ extension of Lot 5 to Lot 2 0,511 km
RN 28 Birni N’Konni–Nigeria border 6,750 km
Road paving is in bad conditions due to the high-level of traffic. A systematic recycling with supply of natural gravel as reinforcement is included. In order to assure road drainage, some geometrical review has been carried out. Principal works : Embankment to widen the roadway: 7.403 m3 Borrow pit: 24.377 m3 Paving recycling : 1.260.000 m2 Earthworks in rippable soil: 29.900 m3 Paving recycling: 1.428.730 m2 Road base in lateritic gravel: 173.233 m3 Sub-grade in natural gravel: 3.783 m3 Bitumen for coating: 2.926 t Aggregates for surface coating: 30.600 m3 C25/30 concrete for structural works: 1.288 m3 Steel for reinforcement : 141 t
- Lot 2 RN1 E: Birni N’Konni –Tsernaoua-Tahoua 129,975 km
+ Crossing of Tsernaoua (0,925+0,725) 1,650 km
Descrizione Servizi
Supervision of the periodic maintenance works.