Urban roads in Dogondoutchi (2200 m) and Birni N’Konni (2050 m)

Supervision of the periodic maintenance works for asphalted roads- 9th FED Road programme (283 km), including urban roads in Dogondoutchi (2200 m) and Birni N’Konni (2050 m)

Country

Niger

Name of Client

Ministère de l’Economie et des Finances

Financing sources

EDF

Duration

02/2007 - 08/2010

Project Description

Works concern 2 lots in the central zone of Niger (283,050 km), in particular :

  • Lot 5 RN1 E: Dogondoutchi –Birni N’Konni 144,164 km (urban roads in Dogondoutchi (2200 m) and Birni N’Konni (2050 m))

+ extension of Lot 5 to Lot 2 0,511 km

RN 28 Birni N’Konni–Nigeria border 6,750 km

Road paving is in bad conditions due to the high-level of traffic. A systematic recycling with supply of natural gravel as reinforcement is included. In order to assure road drainage, some geometrical review has been carried out. Principal works : Embankment to widen the roadway: 7.403 mBorrow pit: 24.377 mPaving recycling : 1.260.000 m   Earthworks in rippable soil: 29.900 m Paving recycling: 1.428.730  mRoad base in lateritic gravel: 173.233 mSub-grade in natural gravel: 3.783 mBitumen for coating: 2.926 t Aggregates for surface coating: 30.600 mC25/30 concrete for structural works: 1.288 mSteel for reinforcement : 141 t

  • Lot 2 RN1 E: Birni N’Konni –Tsernaoua-Tahoua 129,975 km

+ Crossing of Tsernaoua (0,925+0,725) 1,650 km

Services Description

Supervision of the periodic maintenance works.