Koulouba-Kati and Bamako-Koulikoro roads

Technical studies concerning rehabilitation works of the Koulouba-Kati (9 km) and Bamako-Koulikoro (57 km) asphalted roads, and as well periodical maintenance of the Koulikoro-Banamba non-asphalted road (90 km)

Paese

Mali

Cliente

Ministère des Travaux Publics et des Transports

Finanziatore

World Bank

Periodo

06/1996 - 05/1997

Descrizione Progetto

Geotechnical, Hydrological, Traffic and Feasibility Study. Environmental impact and final design.
Covering rehabilitation is envisaged for asphalted roads by surface treatment with 3 layers after reconstruction of natural laterite base layer. As for rural roads, the natural laterite road layer is to be rebuilt. Drainage works have been reinforced on all roads.

Descrizione Servizi

Preliminary and final design.