Technical, economic, environmental and social studies of certain roads in the national road network, section: TIGNERE-KONTCHA-NIGERIA BORDER (132 Km)
Paese
CameroonCliente
Services du Maitre d’Ouvrage Direction des Contrats Cellule des Appels d’OffresFinanziatore
African Development Bank (ADB) and Republic of CameroonAssociazione
INTEGC (member)Periodo
07/2023 - 09/2024Descrizione Progetto
The project looks at the technical, economic, financial, environmental and social impact studies of the 132 km TIGNERE-KONTCHA- NIGERIA BORDER road.
The objective of the project is the rehabilitation of 132 km of the road between Tignère-Kontcha and the Nigeria border as part of Phase III of the Transport Sector Support Program.
The project will be developed in two phases:
Phase I: Preliminary studies, preliminary draft summary (APS) and environmental and social impact studies
Phase II: Detailed Design (APD), and Preparation of Tender documents
The studies will follow Cameroonian national standards, French standards, Eurocodes.
Road project geometry:
- Total road length: 132 km
- Carriageway width: 7 m
- Shoulders width: 10 m
Road quantities:
- Earthworks (fill/cut): 1 800 000 /600 000 m3
- Sub-base: 320 000 m3
- Base course: 260 000 m3
- Wearing course (type, thickness): (AC/ 5 cm) 70 000 m3
Structures:
- Culverts (box/pipe): box culverts 1200 m
- Bridges (number/length): 12/400 m
Descrizione Servizi
PROGRESS REPORTS
PHASE 1
FIRST ESTABLISHMENT REPORT (0.5)
PRELIMINARY STUDIES REPORT (2.5)
APS and ESIA REPORT (4.5)
PHASE 2
APD REPORT (5.5)
TENDER DOCUMENTS (1)