Preinvestment feasibility and execution study for water supply of the towns of Kayes, Bougouni, Markala, Gao and San
Paese
MaliCliente
Ministère du Développement Industriel et du TourismeFinanziatore
ADBAssociazione
Technital SpA – Italy (member)Periodo
02/1983 - 09/1984Descrizione Progetto
Search for water sources and utilisation of these ones; and design of catching water works and distribution networks. Elaboration of 5 Projects (one for each town)
- Hydrogeological and geophysical study for water resources search;
- Hydrological study for hydraulic situation evaluation;
- Socio-economic study;
- Preliminary Design and Feasibility Study;
- Detailed Engineering Design and Final Design;
- Tender Documents.
Town of Gao (166.250 inhabitants)
- 4 wells of 1,80 m of diameter and 40 m in depth for a total discharge of 108 l/s ;
- 3 wells of 1,80 m of diameter and 470 m in depth for a total discharge of 79 l/s ;
- Outlet of untreated water ;
- Treatment plant and return pipes ;
- 1 semi-buried reservoir of 3.700 m3 ;
- 2 water towers of 500 m3
- 0,110 km of iron diversion aqueducts with diameter of 250 - 300 mm ;
- 47,5 km PVC distribution aqueducts with diameter of 80 – 175 mm
- 6,3 km iron distribution aqueducts with diameter of 200 – 400 mm
Town of San (104.406 inhabitants)
- Direct extraction in the Bani river in Beneny, discharge 117 l/s;
- Outlet of untreated water;
- Treatment plant and return pipes;
- 1 semi-buried reservoir of 2.100 m3 ;
- 2 water towers of 500 and 400 m3 ;
- 9 km of iron diversion aqueducts with diameter of 400 mm ;
- 23,5 km of PVC distribution aqueducts with diameter of 80 – 175 mm
- 3 km of iron distribution aqueducts with diameter of 200 – 400 mm
Town of Markala (32.746 inhabitants)
- 1 well of 1,80 m in diameter and 40 m in depth, 37 l/s ;
- Outlet of untreated water;
- Treatment plant and return pipes;
- 1 semi-buried reservoir of 450 m3 ;
- 2 water towers of 400 and 150 m3 ;
- 0,110 km of iron discharge aqueducts with diameter of 200 mm
- 0.110 km iron diversion aqueducts with diameter of 200 mm ;
- 13,9 km of PVC distribution aqueducts with diameter of 80 – 175 mm
- 1,3km of iron distribution aqueducts with diameter of 200 mm
Town of Bougouni (52.705 inhabitants)
- Direct extraction in the Baulé river, discharge 61 l/s;
- Outlet of untreated water;
- Treatment plant and return pipes;
- 1 semi-buried reservoir of 2.11.300 m3 ;
- 1 water tower of 400 m3 ;
- 2,4 km of iron discharge aqueducts with diameter of 300 mm
- 2,3 km iron diversion aqueducts with diameter of 250 mm ;
- 22,5 km of PVC distribution aqueducts with diameter of 80 – 175 mm
- 1 km of iron distribution aqueducts with diameter of 200 – 300 mm
Town of Kayes (201.279 inhabitants)
- Direct extraction in the Sénégal river, discharge 238 l/s
- Outlet of untreated water;
- Treatment plant and return pipes;
- 1 semi-buried reservoir of 4.000 m3 ;
- 3 water tower of 500, 500 and 1000 m3 ;
- 1,4 km of iron discharge aqueducts with diameter of 300 mm
- 2 km of iron diversion aqueducts with diameter of 300 and 500 mm
- 38 km of PVC distribution aqueducts with diameter of 80 – 175 mm
- 5,5 km of iron distribution aqueducts with diameter of 200 – 400 mm.
Descrizione Servizi
Preinvestment, feasibility and final design; drawing up of tender documents for each of the five towns.
- Socio-economic study;
- Hydrogeologic study;
- Hydrological study;
- Technical-economic and financial feasibility study;
- Final design;
- Tender documents.