Control and supervision of the Kani-Boundiali (135 km) road

Control and supervision of management and asphalting works of the Kani-Boundiali (135 km) road in 2x1 carriageway - Lot 1 and 2

Country

Ivory Coast

Duration

06/2017 - 02/2020

Project Description

The roads, which are the subject of this project, contribute to the development of a large transport development program of the Government of Ivory Coast to improve road conditions not only inside the country, but also to facilitate economic exchanges among African countries and at international level. This is a key intervention on both national and international sections, whose improvement will facilitate exchanges between internal countries, Mali, Burkina Faso, Niger and the coast with the ports of Abidjan and San Pedro.

The project for the Kani - Boundiali road of 135 km includes two lots :

  • Lot 1 : Kani - Fadiadougou of 24.8 km. The works will last approximately 12 months.
  • Lot 2 : Fadiadougou – Boundiali of 110.2 km. The works will last approximately 32 months.

The project starts 720 m before the end of the asphalted section in Kani and reaches the towns of Fadiadougou and Morondo and crosses the river Kohoua by a bridge of 93 m in length.

The layout ends at the roundabout of the prefecture of Boundiali, after 1.9 km of road crossing the town of Boundiali.

Services Description

Control and supervision of works.