Consulting Service for Road Rehabilitation and Safety Project - Preparation of Main Designs for Heavy Maintenance (Road Rehabilitation-Upgrading) of the State Roads IB10, IB27 and IIA160 (26.502 km)
Country
SerbiaDuration
07/2017 - 03/2018Project Description
Detailed design for heavy maintenance (rehabilitation/upgrading) of the State Roads IB 10, IB 27 and IIA 160.
- Lot 1: IB10, Sections: Border of APV (Pančevo) – Pančevo (Kovin), L=2.766 km and Pančevo (Kovin) – Border of APV (Pančevo), L=2.754 km
- Lot 2: IB 27, Section: Markovac (highway) – Svilajnac, L=6.208 km
- Lot 3: IIA 160, Section: Svilajnac (Crkvenac) – Medveđa (Glogovac), L=14.774 km.
The total duration of the assignment is 8 months of which:
- Lot 1 shall last 7 months
- Lot 2 shall last 7 months
- Lot 3 shall last 8 months.
Services Description
The following non-exhaustive list describes the contents of the design:
Traffic counts; Geodetic surveys; Geological and Geotechnical surveys on soils and pavements; Hydraulic design; Environmental and Social Issues; Road and Pavement Design; Traffic safety Analysis; Design for Structures; Bidding documents.