Road Galkayo-Faratoyo Lot 2

Contract for consultant service preliminary and detailed engineering design and preparation of bid-document of 85 km stretch existing Garowe-Galkayo road: Galkayo-Faratoyo Lot 2

Country

Somalia

Name of Client

Ministry of Public Works Reconstruction and Housing

Financing sources

African Development Bank

Association

DESCON Architecture and Engineering

Duration

06/2021 - 02/2023

Project Description

Preliminary design, feasibility study and detailed design for the reconstruction of a stretch of the Galkayo-Garowe road (85km). The road alignment is mostly straight and flat. No bridges are present in this stretch, only replacement of culvert is provided by the Project. The width of the existing road is around 5mts and it will be widened up to 11.30 mts and also risen.
The project also include ESIA and RAP reports

Road project geometry:
- Total road length: 85km
- Width of the road in open countryside: 11.30m
- Width of the road in built-up areas: 11.30m
Road quantities:
- Earthworks (fill/cut): 1.500.000 m3
- Base layer in Crushed stone base: 124.000 m3
- Wearing course BB: 31.000 m3
Structures:
- Box culverts: n°53
- Pipe culverts: n°21

Services Description

D-1 Deliverable #1: Inception Report; D-2 Deliverable #2: Project Control Plan; D-3 Deliverable #3: Initial Assessment Report; D-4 Deliverable #3: Monthly Report; D-5 Deliverable #4: Design Base Statement and Design Options Report; D-6 Deliverable #5: Draft Environmental and Social Impact Statement; D-7 Deliverable #6: Draft Economic/Financial Study Report; D-8 Deliverable #7: Stage 1: Road Safety Audit Report; D-9 Deliverable #8: Preliminary Design Report; D-10 Deliverable #9: Quarterly Proress Report; D-11 Deliverable #9: Survey Report; D-12 Deliverable #10: Hydrological, Hydraulics and Structural Report; D-13 Deliverable #11: Soils, Materials & Pavements Report; D-14 Deliverable #12: Draft Detailed Design Report and Bidding Documents; D-15 Deliverable #13: Project Costing Report; D-16 Deliverable #14: Construction Programme; D-17 Deliverable #15: Final Economic/Financial Study Report; D-18 Deliverable #16: Stage 2: Road Safety Audit Report; D-19 Deliverable #17: Final Detailed Design Report and Bidding Documents and Construction Drawings; D-20 Deliverable #18: Final Environmental and Social Impact Statement; D-21 Deliverable #19: Resettlement Action Plan; D-22 Deliverable #20: Draft Completion Report; D-23 Deliverable #21: Final Completion Report