Conducting feasibility study, preliminary and detailed engineering design and preparation of bid-documento of 82 km stretch existing Beledweyne-Galkayo road: Dhusamareb-Qaradhi (60km) and BeledWeyne-Kalabeyr (22km) Lot 1
Country
SomaliaName of Client
Ministry of Public Works Reconstruction and HousingFinancing sources
African Development BankAssociation
DESCON Architecture and EngineeringDuration
05/2021 - 02/2023Project Description
Preliminary design, feasibility study and detailed design for the reconstruction of Dhusamareb-Qaradhi (60km) and BeledWeyne-Kalabeyr (22km) roads. The road alignment is mostly straight and flat. N°6 bridges are present in this stretch; Culverts replacement is also provided by the Project. The width of the existing road is around 5mts and it will be widened up to 11.30 mts and also risen.
The project also include ESIA and RAP reports
Road project geometry:
- Total road length: 82 km
- Width of the road in open countryside: 11.30 m
- Width of the road in built-up areas: 11.30 m
Road quantities:
- Earthworks (fill/cut): 1,450,000 m3
- Base layer in Crushed stone base: 120,000 m3
- Wearing course BB: 30,000 m3
Structures:
- Bridges: n°6 (L=40m-67m-47m-70m-67m-79m)
- Box culverts: n°51
- Pipe culverts: n°18
Services Description
D-1 Deliverable #1: Inception Report; D-2 Deliverable #2: Project Control Plan; D-3 Deliverable #3: Initial Assessment Report; D-4 Deliverable #3: Monthly Report; D-5 Deliverable #4: Design Base Statement and Design Options Report; D-6 Deliverable #5: Draft Environmental and Social Impact Statement; D-7 Deliverable #6: Draft Economic/Financial Study Report; D-8 Deliverable #7: Stage 1: Road Safety Audit Report; D-9 Deliverable #8: Preliminary Design Report; D-10 Deliverable #9: Quarterly Proress Report; D-11 Deliverable #9: Survey Report; D-12 Deliverable #10: Hydrological, Hydraulics and Structural Report; D-13 Deliverable #11: Soils, Materials & Pavements Report; D-14 Deliverable #12: Draft Detailed Design Report and Bidding Documents; D-15 Deliverable #13: Project Costing Report; D-16 Deliverable #14: Construction Programme; D-17 Deliverable #15: Final Economic/Financial Study Report; D-18 Deliverable #16: Stage 2: Road Safety Audit Report; D-19 Deliverable #17: Final Detailed Design Report and Bidding Documents and Construction Drawings; D-20 Deliverable #18: Final Environmental and Social Impact Statement; D-21 Deliverable #19: Resettlement Action Plan; D-22 Deliverable #20: Draft Completion Report; D-23 Deliverable #21: Final Completion Report