Road linking the Production center of Fresilia to the road “Fondo Valle Trigno”
Country
ItalyName of Client
Comunità Montana SannioFinancing sources
Regione MoliseAssociation
dr. Carlo Scasserra (member)Duration
10/1990 - 04/1997Project Description
Preliminary and final design, 1st lot, 3rd and 4th part (11,633 km). Works supervision, control and accounting for the 1st lot – 3rd part.
Two lots on the transversal connection between F.V. Biferno and F.V. Trigno. It crosses grounds made of sandstone and shaley marl with numerous bearing structures and viaducts.
This is a track complex enough geologically speaking: marl is extremely altered and there is an elevated degree of fracturing as far as the stony formation is concerned.
1st lot – 3rd part: Viaducts of: S. Rocco I (109.20 lm), Tre Confini (141 lm), S. Rocco II (73.50 lm), S. Maria (81.20 lm) and Defensa (36 lm) – prestressed reinforced concrete beams of 36 lm.
1st lot – 4th part:Viaducts of: Vigne (142.20 lm), Pelaciupo (106.30 lm), Merigo (106 lm), Formoso (322 lm), Castellano (177 lm - prestressed reinforced concrete beams of 35.20 lm). Bridge on the Trigno stream (476 lm – spans of 54 m – Foundations on piles, Æ 1200 / Æ 1500). Tunnels of: Pelaciupo (42 m), Castellana (105 m).
Services Description
Feasibility study, Preliminary and final design, Topographical survey, Geological-technical study, Preparation of Tender documents, Work Supervision.