Gitarama-Ngororero-Mukamira road

Review of the final design and preparation of tender documents for the construction and paving works of the Gitarama-Ngororero-Mukamira road (72.6 km)

Country

Rwanda

Name of Client

Ministère des Infrastructures

Financing sources

Government of Rwanda

Duration

06/2004 - 04/2006

Project Description

The project aim is the executive project updating and the tender documents preparation. Our activity mainly concerned the study of possible plano-altimetric variants and the slope stability study. All along the road from Gitarama to Mukamira, in fact, are present from serious to very serious slope instability problems in many cut
sections or even instability of road fill sections. Besides that, we have
carried out traffic study in order The project aim is the executive project
updating and the tender documents preparation. Our activity mainly concerned
the study of possible plano-altimetric variants and the slope stability study.
All along the road from Gitarama to Mukamira, in fact, are present from serious
to very serious slope instability problems in many cut sections or even
instability of road fill sections. Besides that, we have carried out traffic
study in order to enable the economic study and the feasibility analysis and
the environmental study. to enable the economic study and the feasibility
analysis and the environmental study.

Services Description

Update and elaboration of designs and tender documents.
Topographic surveys, geotechnical study, laboratory tests, hydraulic study.
Earth movement study, traffic signs study, geotechnical analysis, computation
of works, preparation of Tender Documents.