Definition and elaboration study of works to be carried out on the roads Gossas-Kaolack – Sokone / Nioro Du Rip / Birkelane (196.7 km)
Paese
SenegalCliente
Agence Autonome des Travaux RoutiersFinanziatore
EDFAssociazione
ASSOCIATED ENGINEERS (Sub-consultancy)Periodo
12/2003 - 06/2005Descrizione Progetto
Rehabilitation of 196,7 km of paved roads: Kaolack-Nioro (56,7 km), Kaolack-Birkelane (37 km), by-pass of Kaolack (20 km), Kaolack-Sokone (43 km), Kaolack-Gossas (40 km), with a widening of the road platform at m 10,20.
The project includes the reconstruction of approximately 220 km of earth roads.
Descrizione Servizi
The project includes a technical-economic analysis with traffic study, layout topographic study, geotechnical study, bill of quantities and tender documents preparation.