Hawassa-Chuko road

Construction Supervision of Mombasa-Nairobi-Addis Ababa Road Corridor Phase III Project, Hawassa-Ageremariam Section, Lot 1: Hawassa-Chuko

Country

Ethiopia

Name of Client

Ethiopian Roads Authority

Financing sources

African Development Fund (ADF)

Association

Eng.Zewdie (subconsultant)

Duration

10/2012 - 12/2018

Project Description

The existing project road Hawassa - Ageremariam road was built several years ago with Double Surface Treatment (DST) and currently serves moderate level of traffic volume. The traffic volume on the road is expected to drastically increase in the near future when Ethiopia commence to use Kenya’s port of Mombasa.

Services Description

Supervision of the construction of the project on behalf of the Employer throughout the entire construction time, including Defects Liability (Maintenance) Period.