Supervision of works for the reconstruction of priority sections on the Kampala-Mbarara road (Northern Corridor): Package B: Masaka-Mbarara and Masaka-Kyotera
Country
UgandaName of Client
UNRAFinancing sources
EDFAssociation
TECHNITAL SpA – Italia (member) and SABA Engineering Plc – Etiopia (member)Duration
01/2008 - 08/2012Project Description
The works concern the following section: Package B – Masaka-Mbarara and Masaka-Kyotera (154 km)
Rehabilitation of the carriageway (widening to 11 meters), including the construction of 11 meters of sub-base (17 cm) and base (25 cm) in graded aggregates; the construction of 7 meters of asphalt base (DBM) of 10 cm and asphalt concrete coating of 5 cm; and a surface dressing treatment of shoulders.
The works included also urban crossings and swamps treatment in rockfill.
Services Description
The services carried out are: Design review; Tender assistance; Works supervision for the reconstruction of priority sections on the Kampala-Mbarara road.