Technical assistance for final design and preparation of tender documents for rehabilitation works of the Kayes-Kidira road (100 km)
Paese
MaliCliente
Ministère de l’Equipement, de l’Aménagement du Territoire, de l’Environnement et de l’UrbanismeFinanziatore
EDFPeriodo
05/2000 - 07/2002Descrizione Progetto
The road is approximately 100 km in length. It starts in Kidira, at the border between Mali and Senegal, at the bridge over the Falemé river, inside the town of Kayes at the beginning of the Kayes bridge over the Senegal river.
The existing road is unpaved and it was built between 1987 and 1992. Since then, no periodic maintenance works were done. Therefore, due to its wear and degradation condition, the road needs to be asphalted.
Descrizione Servizi
Economic feasibility study, environmental impact study, final design for rehabilitation works, preparation of tender documents for construction works.
Core boring for determining the thickness of the road embankment, material quality analysis, laboratory tests (Atterberg limits, Proctor, CBR, Los Angeles, etc.).