Control and supervision of rehabilitation works of the Kwango-Kenge road
(70+304 km) and improvement of 140 km of rural roads
Country
Dem. Rep. of CongoName of Client
Ministère des Infrastructures, Travaux Publics et ReconstructionFinancing sources
ADF (African Development Fund)Duration
07/2008 - 01/2011Project Description
The project is included in the basic infrastructure rehabilitation program envisaging the control of traffic on approximately 15.870 km of primary roads.
The road axis Nsele-Lufimi and Kwango-Kenge represent two important sections of the national road n. 1 linking the town of Kinshasa to the town of Kikwit, and to Kenge and Masimanimba territories.
The RN1 is a section bearing a large volume of traffic related to the Kenge (1.000.000 inhabitants) and Masimanimba (800.000 inhabitants) territories, besides the towns of Kinshasa (8.000.000 inhabitants) and Kikwit (500.000 inhabitants).
This axis is very important for what concerns the isolation of the Kinshasa province, of Bandundu and Kasai provinces, and for the rehabilitation of traffic continuity between Kinshasa and Kikwit.
The rehabilitation of the road and its structures, the increase in the road capacity and the rehabilitation of road crossings will improve traffic fluidity between Kinshasa and Kikwit and will contribute to cost and goods interurban transport time reduction, and to the access of people to public and social services.
Services Description
Control and supervision of rehabilitation works of the Kwango-Kenge road (70 km) and improvement of 140 km of rural tracks.
The AIC Progetti mission is composed by : an engineer project manager, a road engineer team leader, a geotechnician, an hydraulic engineer, a surveyor, a geotechnical team, a topographical team, support staff. AIC Progetti carried out a thorough technical review of the design form a geotechnical and hydraulic point of view.
Administration personnel training for maintenance and rehabilitation roads control works, environmental works and administrative procedures.