N’Goura-Bokoro road

Final design of the N’Goura-Bokoro road (104 km)

Country

Chad

Name of Client

Ministère des Travaux Publics et des Transports

Financing sources

IDA

Duration

08/2002 - 07/2003

Project Description

The N’Goura-Bokoro road is 104 km long and is part of the N’Djamena-Abéché–Sudan border network that allows the link in the central and eastern part of the country. The road is part of a 1600 km network that should be paved by the year 2009, according to the Chad transport plan.

Services Description

Total review of inception preliminary design and preparation of Tender documents in order to allow to call the bid for road paving works. Layout study, topographic surveys,
hydrologic study, slope and embankment protection works, material research,
road level construction, final design and bill of quantities, preparation of
tender dossier and documents.