Final design of the N’Goura-Bokoro road (104 km)
Country
ChadName of Client
Ministère des Travaux Publics et des TransportsFinancing sources
IDADuration
08/2002 - 07/2003Project Description
The N’Goura-Bokoro road is 104 km long and is part of the N’Djamena-Abéché–Sudan border network that allows the link in the central and eastern part of the country. The road is part of a 1600 km network that should be paved by the year 2009, according to the Chad transport plan.
Services Description
Total review of inception preliminary design and preparation of Tender documents in order to allow to call the bid for road paving works. Layout study, topographic surveys,
hydrologic study, slope and embankment protection works, material research,
road level construction, final design and bill of quantities, preparation of
tender dossier and documents.