Country
El SalvadorName of Client
Ministerio de Obras Publicas - Dirección General de CaminosFinancing sources
BID (Banco Inter-Americano de Desarrollo)Association
NHA-Compañia de Ingenieros – El Salvador (50 %) (member)Duration
05/1997 - 11/2000Project Description
Rehabilitation of the Quitasol-El Poy road (47,6 km). Asphalted road in mountainous area. Rehabilitation of 1 metallic bridge (El Gramal 40 m), 3 concrete bridges (Jupula: 20.60 m; S. Ignacio: 20.60 m; La Palma: 40.90 m). Design review.
The Quitasol-El Poy section is the last part of the Carretera Troncal del Norte (CA-4) connecting the capital El Salvador to the Honduras border and being part of the Central American road network, linking the Pacific coast of El Salvador to the Atlantic coast of the Honduras Republic.
Services Description
Works supervision and control.