Final design of rehabilitation works of the RN 1 road, section of 19 km, between the Kabuba bridge (Ch 179+000) and the Kwango bridge (Ch 198+000)
Paese
Dem. Rep. of CongoCliente
Government of the Republic of CongoFinanziatore
European CommissionPeriodo
07/2003 - 12/2003Descrizione Progetto
The project involves a road characterized by particular phenomena of surface degradation linked to the geological formation of the area and to the erosive action of surface waters. The phenomena has been faced with consolidation interventions and surface and deep drainage works, and with the use of surface water intakes.
Descrizione Servizi
Final design of rehabilitation works.