Yaoundé-Kribi road

Preliminary design, detailed design, preparation of tender documents for the construction of the road Pont d’Olama-Kribi on the main route Yaounde-Kribi (203,82 km) and of the Ngoumoui-Otele-Makaka (42,15 km) link

Country

Cameroon

Name of Client

Ministry of Public Works

Financing sources

Cameroon Government

Association

SADEG – Cameroon

Duration

03/2004 - 07/2010

Project Description

It concerns a road that crosses the equatorial forest passing through a very rough land and linking Kribi to Yaoundé after approximately 270 km. Kribi is destined to become the second harbor of the country and is the terminal of the Chad-Cameroon pipe-line.

Services Description

Elaboration of designs and tender documents, topographic
surveys, geotechnical study, laboratory tests, hydraulic study, traffic signs
study, bills of quantities. The following studies have been conceived: Layout
study; topographic study; geotechnical study; surveys on roadbed, sample
checks, construction material research, laboratory tests, etc.; hydrologic,
hydraulic and structural studies; traffic study; environmental and social
studies; expropriations dossier; drawings; bill of quantities; preparation of
tender documents.