Uruguay river

Technical assistance within the regional development project and improvement of the Uruguay river navigability.

Country

Uruguay

Name of Client

Comisión Administrador del río Uruguay (CARU)

Financing sources

European Commission

Association

CNR – France (Leader)

Duration

11/2001 - 10/2003

Project Description

The main scope of the project is the navigability improvement, the extension of navigable area of the Uruguay river and the river transport development, strengthening it wherever already active and creating it in sections where it does not exist. The objectives to be reached are:
1. Increase in good volumes, reduction of load costs and increase in good interchange competitiveness.
2. Promoting regional development and harmonizing the regulations of the two involved countries. In particular, the project allows to improve land regulation since it connects different kinds of multimodal transport.
As far as project specific objectives are concerned, a first phase includes the realization of a social, technical and economic pre-feasibility study of the Uruguay river and the involved area for navigability condition improvement. A second phase involves the realization of a detailed preliminary design of all works required for improving the navigability and extend the navigable area.
The project is divided in two phases: the first one includes a regional socio-economic analysis of the river area; a technical-economic analysis of the river navigability; and a project socio-cultural and environmental impact analysis. A second phase involves the implementation of a detailed preliminary design of all envisaged structures.

Services Description

Technical assistance within the regional development project and improvement of the Uruguay river navigability.
1° phase: review of existing data and designs; Socio-economic analysis: traffic study; River traffic capacity study; Evaluation of cartography, bathymetric, hydraulic, hydrologic and morphologic data; Bridge and bridge infrastructure analysis; Definition of fleet and navigation canal characteristics; Regularization of the river upstream and downstream of Salto Grande; Environmental impact study; Economic, financial and social evaluation of alternatives; Legal and institutional analysis;
2° phase: Detailed technical study of the selected solution; Environmental impact study; Economic, financial and social evaluation of the selected solution